Category
Hanging Optic Fiber Lighting Decorated LED Jellyfish Light for Holiday Lighting
Overview Package size per unit product 20.00cm * 12.00cm * 12.00cm Gross weight per unit product 1.000kg Product Descrip
Basic Info
Model NO. | DSM-001 |
Style | modern |
Color Temperature | Warm White |
Lamp Body Material | PMMA Fiber + PVC Injection Base |
Lighting Area | 3-5m^2 |
Power | ≤5W |
Technics | Manual |
Warranty | 1 YEAR |
IP Rating | IP65 |
Certification | CE, RoHS |
Voltage | 220V |
Light Source | With Light Source |
Transport Package | The Cartons |
Specification | 75*60*60cm |
Trademark | spend half a li |
Origin | China |
HS Code | 9405429000 |
Production Capacity | 1000000/Year |
Packaging & Delivery
Package size per unit product 20.00cm * 12.00cm * 12.00cm Gross weight per unit product 1.000kgProduct Description
Product Description
1.Plastic optical fiber, not easy to break, not easy to deform, 160 large circles and 100 small circles.2.High-bright lamp beads, the light is soft and bright, and more warm, illuminating your way home.3.Double-layer optical fiber design, dense and even distribution, make the jellyfish more layered.
Product Parameters
Product Name | LED fiber optic giant jellyfish |
Product material | pmma fiber + PVC injection base |
Product size | Diameter 60/80/100cm (double flower) |
Product voltage | 24V/220V |
Product power | 3W |
Product color | red/yellow/blue/green/purple/white |
Waterproof level | IP65 |
Application scenarios | Outdoor/park/square/garden/villa/community/courtyard/lawn/street/tree/light show |
Detailed Photos
Our Advantages
FAQ
Q1. Can I have a sample order for led light?A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q2. What about the lead time?
A:Sample needs 5-7 days, mass production lead time around 20-40days. It depends on order quantity and season.
Q3. Do you have any MOQ limit for led light order?
A: Low MOQ, 1pc for sample checking is available. Mass production MOQ different product with different MOQ. Need to double confirm when enquiry.
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
Q5. Is it OK to print my logo on led light product?
A: Yes. Please inform us formally before our production and confirm the design firstly based on our sample.
Q6: Can you develop the new product for us?
A: Yes, OEM is welcome. We have a professional engineer team with rich experience can develop the new product according to your request.